Industrial engineering facility HVAC project
Industrial & Engineering Facility

Erectors (Dual Project)

A mixed Hitachi deployment combining 380 TR duct type ventilation and 300 TR VRF systems for a complex industrial and engineering environment.

ClientErectors
LocationBangladesh
System Type380 TR + 300 TR | Hitachi Systems
BrandHitachi
Project Overview

Project snapshot

The Erectors project combined two HVAC scopes in one industrial and engineering facility. The delivery needed to coordinate a ducted ventilation package alongside a separate VRF system so the building could handle airflow balance and occupied-space comfort together.

How We Worked

Scope of work

Deployment of mixed HVAC systems including Hitachi duct type ventilation and a Hitachi VRF system for different operational zones in the same facility.

System Highlights

System highlights

Combined ducted + VRF solution

Integrated ventilation system

High-capacity industrial airflow management

Challenges & Solutions

What had to be solved and how we solved it

What needed to be solved

The facility required two HVAC approaches to work in parallel without conflict. The project had to keep airflow balanced while maintaining reliable cooling for distinct industrial zones.

How the design was shaped

We paired the ducted ventilation and VRF scopes with integrated planning so the two systems could support each other instead of competing for capacity or control priority.

Equipment Used

Equipment used

380 TR Hitachi Duct Type & Ventilation300 TR Hitachi VRF SystemAir Distribution NetworkControls & BalancingCommissioning Support
Project Outcome

Outcome

Delivered a hybrid HVAC solution tailored for complex industrial requirements ensuring airflow balance and operational stability.

Need a similar project?

Let’s plan your next HVAC delivery with confidence.

We can help you structure the project, define the equipment path, and prepare a clear technical proposal for your site.