Industrial facility cooling project
Industrial Facility

Meghna Group

A 400 TR Hitachi VRF system delivered for an industrial facility in Bangladesh, structured for reliable cooling, efficient zoning, and continuous operation.

ClientMeghna Group
LocationBangladesh
System Type400 TR | VRF System
BrandHitachi
Project Overview

Project snapshot

This industrial facility required a dependable cooling system that could support production activity while staying efficient and manageable over long operating hours. The project was shaped around an industrial-grade Hitachi VRF solution that provides stable comfort with controlled energy use.

How We Worked

Scope of work

End-to-end HVAC execution using a Hitachi VRF system including design, supply, installation, and commissioning.

System Highlights

System highlights

Industrial-grade VRF system

Optimized load calculation and zoning

Continuous operation capability

Challenges & Solutions

What had to be solved and how we solved it

What needed to be solved

The facility needed reliable cooling for industrial operations without creating high energy overhead or complex maintenance demands. Keeping the system stable across long production cycles was a key concern.

How the design was shaped

We structured the VRF system around load calculation and zoning so the plant could run efficiently while maintaining dependable temperature control across the facility.

Equipment Used

Equipment used

400 TR Hitachi VRF SystemIndoor Fan Coil UnitsOutdoor Condensing UnitsRefrigerant Piping & ControlsTesting and Commissioning
Project Outcome

Outcome

Ensured reliable and efficient cooling for industrial operations with minimized energy consumption.

Need a similar project?

Let’s plan your next HVAC delivery with confidence.

We can help you structure the project, define the equipment path, and prepare a clear technical proposal for your site.